Solar power plant, Arizona

Agua Caliente Solar Project, Arizona

Agua Caliente Solar Project is a 348 MW solar power plant in Yuma County, Arizona, operated by Agua Caliente Solar, and it generated 546,916 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Arizona, and its capacity factor sits at the 17th percentile of U.S. solar plants. By 2025 generation it ranks 1,248th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

348 MWNameplate capacity
18%Capacity factor, 2025, 17th percentile, on 348 MW net summer
0.5%Of AZ generation, 2025
12 yearsAverage generator age, by MW

How hard does the Agua Caliente Solar Project plant run compared with other solar plants?

The Agua Caliente Solar Project plant had a capacity factor of 18% in 2025 on 348 MW of net summer capacity, the 17th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 66 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Agua Caliente Solar Project18%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Agua Caliente Solar Project plant generating more or less than last year?

Generation at Agua Caliente Solar Project fell 16.6% from 2024 to 2025, from 656,051 MWh to 546,916 MWh. Through August 2026 it is running 12.4% behind the same months of 2025.

Net generation by period
PeriodMWh
2024656,051
2025546,916
2026 through August314,109
2025, same months358,421
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202662,232
July 202661,661
June 202647,949
May 202624,712
April 202613,124
March 202628,824
February 202632,487
January 202643,120
December 202540,186
November 202542,749
October 202548,670
September 202556,890
August 202566,505
July 202569,241
June 202558,244
May 202544,131
April 202535,414
March 202523,745
February 202518,382
January 202542,759
December 202441,455
November 202438,237
October 202453,153
September 202462,138
August 202465,268
July 202466,918
June 202461,149
May 202466,471
April 202452,014
March 202458,102
February 202448,098
January 202443,048

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Agua Caliente Solar Project plant?

Agua Caliente Solar Project made 0.5% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.9% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 36th largest of 191 plants in Arizona, the 938th largest of 14,327 in the U.S. and the 24th largest of 7,223 solar plants. By 2025 generation it is the 34th largest of 167 generating plants in the state.

Agua Caliente Solar Project within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)34840,5140.9%
Generation (MWh)546,916115,800,3780.5%
Solar capacity (MW)3486,6725.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Agua Caliente Solar Project plant, and when do they retire?

3 operable generators total 348 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s3348100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
AGU1OperatingSolar Photovoltaic912012n/a
AGU2OperatingSolar Photovoltaic1362012n/a
AGU3OperatingSolar Photovoltaic1212014n/a
AGU01Postponed indefinitelySolar Photovoltaic290n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Agua Caliente Solar Project plant?

First Solar Project Development is the only joint owner reported for Agua Caliente Solar Project, with 100.0%. Agua Caliente Solar operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Agua Caliente Solar Project plant?

Agua Caliente Solar Project is in Dateland, Yuma County, Arizona, at 32.9774° N, 113.4945° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Agua Caliente Solar Project's 348 MW is 5% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Sonoran Solar EnergyMaricopa4901,123,701
Agua Caliente Solar ProjectYuma348546,916
Eleven Mile Solar CenterPinal300833,421
McFarland B Solar and StorageYuma300613,094
Sun Streams 4Maricopa300690,165

Source: EIA Forms EIA-860 and EIA-923, 2025.