Eleven Mile Solar Center, Arizona

Eleven Mile Solar Center is a 600 MW power plant, 300 MW of it solar, in Pinal County, Arizona, operated by Eleven Mile Solar Center, LLC, and it generated 792,639 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Arizona, and its capacity factor sits at the 96th percentile of U.S. solar plants. By 2025 generation it ranks 890th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

600 MWNameplate capacity
32%Capacity factor, 2025, solar units, 96th percentile, on 300 MW net summer
0.7%Of AZ generation, 2025
1 yearAverage generator age, by MW

How hard does the Eleven Mile Solar Center plant run compared with other solar plants?

The Eleven Mile Solar Center plant's solar units had a capacity factor of 32% in 2025 on 300 MW of net summer capacity, the 96th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 116 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Eleven Mile Solar Center32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Eleven Mile Solar Center plant generating more or less than last year?

Eleven Mile Solar Center generated 792,639 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 4.3% behind the same months of 2025. 2024 has output for only 7 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024416,419
2025792,639
2026 through August558,450
2025, same months583,821
Monthly generation, Jun 2024 to Aug 2026
MonthMWh
August 202675,003
July 202681,544
June 202678,069
May 202687,820
April 202674,180
March 202672,437
February 202649,224
January 202640,173
December 202539,329
November 202543,027
October 202558,867
September 202567,595
August 202580,934
July 202585,884
June 202592,329
May 202585,740
April 202578,554
March 202569,461
February 202551,399
January 202539,520
December 202439,189
November 202444,666
October 202464,767
September 202429,908
August 202479,783
July 202485,238
June 202472,867

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Eleven Mile Solar Center plant?

Eleven Mile Solar Center made 0.7% of the 115,800,378 MWh reported by Arizona plants in 2025, from 1.5% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 26th largest of 191 plants in Arizona, the 604th largest of 14,327 in the U.S. and the 51st largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 27th largest of 167 generating plants in the state.

Eleven Mile Solar Center within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)60040,5141.5%
Generation (MWh)792,639115,800,3780.7%
Solar capacity (MW)3006,6724.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Eleven Mile Solar Center plant, and when do they retire?

2 operable generators total 600 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2600100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1111OperatingSolar Photovoltaic3002024n/a
2222OperatingBatteries3002024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Eleven Mile Solar Center plant?

EIA lists no joint owners for Eleven Mile Solar Center. Eleven Mile Solar Center, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Eleven Mile Solar Center plant use?

Eleven Mile Solar Center has capacity on 2 fuels: 50% solar and 50% battery and pumped storage. In 2025, solar made 105% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar30050.0%833,421
Battery and pumped storage30050.0%-40,782

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Eleven Mile Solar Center plant?

Eleven Mile Solar Center is in Coolidge, Pinal County, Arizona, at 32.8610° N, 111.5919° W. It sits in the Salt River Project balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Eleven Mile Solar Center's 300 MW is 4% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Sonoran Solar EnergyMaricopa4901,123,701
Agua Caliente Solar ProjectYuma348546,916
Eleven Mile Solar CenterPinal300833,421
McFarland B Solar and StorageYuma300613,094
Sun Streams 4Maricopa300690,165
Harquahala 2Maricopa300687,037