Harquahala 2 is a 600 MW power plant, 300 MW of it solar, in Maricopa County, Arizona, operated by Copia Power, and it generated 648,280 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Arizona, and its capacity factor sits at the 72nd percentile of U.S. solar plants. By 2025 generation it ranks 1,060th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

600 MWNameplate capacity
26%Capacity factor, 2025, solar units, 72nd percentile, on 300 MW net summer
0.6%Of AZ generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Harquahala 2 plant run compared with other solar plants?

The Harquahala 2 plant's solar units had a capacity factor of 26% in 2025 on 300 MW of net summer capacity, the 72nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 95 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Harquahala 226%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Harquahala 2 plant generating more or less than last year?

Harquahala 2 generated 648,280 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 41.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025648,280
2026 through August606,851
2025, same months428,250
Monthly generation, Apr 2025 to Aug 2026
MonthMWh
August 202679,227
July 202678,817
June 202691,448
May 202695,558
April 202679,324
March 202679,682
February 202652,930
January 202649,865
December 202543,415
November 202544,544
October 202564,808
September 202567,263
August 202586,828
July 202589,432
June 202597,159
May 202588,785
April 202566,046

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Harquahala 2 plant?

Harquahala 2 made 0.6% of the 115,800,378 MWh reported by Arizona plants in 2025, from 1.5% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 26th largest of 191 plants in Arizona, the 604th largest of 14,327 in the U.S. and the 56th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 28th largest of 167 generating plants in the state.

Harquahala 2 within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)60040,5141.5%
Generation (MWh)648,280115,800,3780.6%
Solar capacity (MW)3006,6724.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Harquahala 2 plant, and when do they retire?

2 operable generators total 600 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2600100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BESS1OperatingBatteries3002025n/a
PV1OperatingSolar Photovoltaic3002025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Harquahala 2 plant?

EIA lists no joint owners for Harquahala 2. Copia Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Harquahala 2 plant use?

Harquahala 2 has capacity on 2 fuels: 50% solar and 50% battery and pumped storage. In 2025, solar made 106% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar30050.0%687,037
Battery and pumped storage30050.0%-38,757

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Harquahala 2 plant?

Harquahala 2 is in Tonopah, Maricopa County, Arizona, at 33.4600° N, 113.1100° W. It sits in the Arizona Public Service Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Harquahala 2's 300 MW is 4% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Eleven Mile Solar CenterPinal300833,421
McFarland B Solar and StorageYuma300613,094
Sun Streams 4Maricopa300690,165
Harquahala 2Maricopa300687,037
Box Canyon (AZ)Pinal300506,892
Solana Generating StationMaricopa280845,906
Roadrunner Solar and BESSCochise23532,947

Source: EIA Forms EIA-860 and EIA-923, 2025.