Solar power plant, Arizona
Box Canyon solar power plant, Arizona
Box Canyon (AZ) is a 300 MW solar power plant in Pinal County, Arizona, operated by BOCA bn, LLC, and it generated 506,892 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Arizona, and its capacity factor sits at the 22nd percentile of U.S. solar plants. By 2025 generation it ranks 1,323rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Box Canyon (AZ) plant run compared with other solar plants?
The Box Canyon (AZ) plant had a capacity factor of 19% in 2025 on 300 MW of net summer capacity, the 22nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 70 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Box Canyon (AZ) | 19% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Box Canyon (AZ) plant generating more or less than last year?
Box Canyon (AZ) generated 506,892 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 129.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 506,892 |
| 2026 through August | 631,084 |
| 2025, same months | 274,536 |
Monthly generation, Jun 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 81,995 |
| July 2026 | 85,875 |
| June 2026 | 97,849 |
| May 2026 | 98,155 |
| April 2026 | 82,691 |
| March 2026 | 81,745 |
| February 2026 | 54,869 |
| January 2026 | 47,905 |
| December 2025 | 46,665 |
| November 2025 | 49,500 |
| October 2025 | 65,953 |
| September 2025 | 70,238 |
| August 2025 | 81,070 |
| July 2025 | 93,289 |
| June 2025 | 100,177 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Box Canyon (AZ) plant, and when do they retire?
1 operable generator totals 300 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 300 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BOCA1 | Operating | Solar Photovoltaic | 300 | 2025 | n/a |
| BOCA2 | Cancelled | Batteries | 300 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Box Canyon (AZ) plant?
EIA lists no joint owners for Box Canyon (AZ). BOCA bn, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Box Canyon (AZ) plant?
Box Canyon (AZ) is in Florence, Pinal County, Arizona, at 33.1606° N, 111.3692° W. It sits in the Arizona Public Service Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Arizona are similar in size?
Arizona has 111 operable solar plants with 6,672 MW of capacity, and Box Canyon (AZ)'s 300 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| McFarland B Solar and Storage | Yuma | 300 | 613,094 |
| Sun Streams 4 | Maricopa | 300 | 690,165 |
| Harquahala 2 | Maricopa | 300 | 687,037 |
| Box Canyon (AZ) | Pinal | 300 | 506,892 |
| Solana Generating Station | Maricopa | 280 | 845,906 |
| Roadrunner Solar and BESS | Cochise | 235 | 32,947 |
| Sun Streams 3 | Maricopa | 215 | 532,548 |
Source: EIA Forms EIA-860 and EIA-923, 2025.