Solar power plant, Arizona

Sun Streams 4 solar power plant, Arizona

Sun Streams 4 is a 600 MW power plant, 300 MW of it solar, in Maricopa County, Arizona, operated by Sun Streams Expansion, LLC, and it generated 647,185 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Arizona, and its capacity factor sits at the 73rd percentile of U.S. solar plants. By 2025 generation it ranks 1,061st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

600 MWNameplate capacity
26%Capacity factor, 2025, solar units, 73rd percentile, on 300 MW net summer
0.6%Of AZ generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Sun Streams 4 plant run compared with other solar plants?

The Sun Streams 4 plant's solar units had a capacity factor of 26% in 2025 on 300 MW of net summer capacity, the 73rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sun Streams 426%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Sun Streams 4 plant generating more or less than last year?

Sun Streams 4 generated 647,185 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 18.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025647,185
2026 through August536,437
2025, same months451,352
Monthly generation, Mar 2025 to Aug 2026
MonthMWh
August 202674,391
July 202678,729
June 202677,170
May 202690,823
April 202671,965
March 202657,724
February 202646,349
January 202639,286
December 202536,229
November 202540,287
October 202557,015
September 202562,302
August 202578,517
July 202582,542
June 202586,143
May 202565,915
April 202577,254
March 202560,981

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Sun Streams 4 plant?

Sun Streams 4 made 0.6% of the 115,800,378 MWh reported by Arizona plants in 2025, from 1.5% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 26th largest of 191 plants in Arizona, the 604th largest of 14,327 in the U.S. and the 55th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 29th largest of 167 generating plants in the state.

Sun Streams 4 within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)60040,5141.5%
Generation (MWh)647,185115,800,3780.6%
Solar capacity (MW)3006,6724.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sun Streams 4 plant, and when do they retire?

2 operable generators total 600 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2600100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN01OperatingSolar Photovoltaic3002025n/a
GEN02OperatingBatteries3002025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sun Streams 4 plant?

EIA lists no joint owners for Sun Streams 4. Sun Streams Expansion, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Sun Streams 4 plant use?

Sun Streams 4 has capacity on 2 fuels: 50% solar and 50% battery and pumped storage. In 2025, solar made 107% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar30050.0%690,165
Battery and pumped storage30050.0%-42,980

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Sun Streams 4 plant?

Sun Streams 4 is in Tonopah, Maricopa County, Arizona, at 33.3613° N, 112.7801° W. It sits in the Arizona Public Service Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Sun Streams 4's 300 MW is 4% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Agua Caliente Solar ProjectYuma348546,916
Eleven Mile Solar CenterPinal300833,421
McFarland B Solar and StorageYuma300613,094
Sun Streams 4Maricopa300690,165
Harquahala 2Maricopa300687,037
Box Canyon (AZ)Pinal300506,892
Solana Generating StationMaricopa280845,906

Source: EIA Forms EIA-860 and EIA-923, 2025.