Solar power plant, Arizona

McFarland B Solar and Storage power plant, Arizona

McFarland B Solar and Storage is a 450 MW power plant, 300 MW of it solar, in Yuma County, Arizona, operated by AES Clean Energy, and it generated 600,499 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Arizona, and its capacity factor sits at the 52nd percentile of U.S. solar plants. By 2025 generation it ranks 1,125th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

450 MWNameplate capacity
23%Capacity factor, 2025, solar units, 52nd percentile, on 300 MW net summer
0.5%Of AZ generation, 2025
1 yearAverage generator age, by MW

How hard does the McFarland B Solar and Storage plant run compared with other solar plants?

The McFarland B Solar and Storage plant's solar units had a capacity factor of 23% in 2025 on 300 MW of net summer capacity, the 52nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 85 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
McFarland B Solar and Storage23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the McFarland B Solar and Storage plant generating more or less than last year?

McFarland B Solar and Storage generated 600,499 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 50.2% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.

Net generation by period
PeriodMWh
20249,306
2025600,499
2026 through August594,850
2025, same months396,036
Monthly generation, Dec 2024 to Aug 2026
MonthMWh
August 202681,532
July 202687,589
June 202698,270
May 202695,159
April 202669,398
March 202665,221
February 202651,597
January 202646,084
December 202541,669
November 202545,638
October 202545,388
September 202571,768
August 202572,576
July 202571,735
June 202573,131
May 202557,186
April 202568,101
March 202532,511
February 20252,628
January 202518,168
December 20249,306

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the McFarland B Solar and Storage plant?

McFarland B Solar and Storage made 0.5% of the 115,800,378 MWh reported by Arizona plants in 2025, from 1.1% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 31st largest of 191 plants in Arizona, the 793rd largest of 14,327 in the U.S. and the 52nd largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 31st largest of 167 generating plants in the state.

McFarland B Solar and Storage within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)45040,5141.1%
Generation (MWh)600,499115,800,3780.5%
Solar capacity (MW)3006,6724.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the McFarland B Solar and Storage plant, and when do they retire?

2 operable generators total 450 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2450100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BESSOperatingBatteries1502024n/a
MCFRBOperatingSolar Photovoltaic3002024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the McFarland B Solar and Storage plant?

EIA lists no joint owners for McFarland B Solar and Storage. AES Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the McFarland B Solar and Storage plant use?

McFarland B Solar and Storage has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 102% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar30066.7%613,094
Battery and pumped storage15033.3%-12,595

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the McFarland B Solar and Storage plant?

McFarland B Solar and Storage is in Dateland, Yuma County, Arizona, at 32.9575° N, 113.4760° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and McFarland B Solar and Storage's 300 MW is 4% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Sonoran Solar EnergyMaricopa4901,123,701
Agua Caliente Solar ProjectYuma348546,916
Eleven Mile Solar CenterPinal300833,421
McFarland B Solar and StorageYuma300613,094
Sun Streams 4Maricopa300690,165
Harquahala 2Maricopa300687,037
Box Canyon (AZ)Pinal300506,892

Source: EIA Forms EIA-860 and EIA-923, 2025.