Solar power plant, Arizona
Roadrunner Solar and BESS power plant, Arizona
Roadrunner Solar and BESS is a 235 MW solar power plant in Cochise County, Arizona, operated by Clenera LLC, and it generated 32,947 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 2nd percentile of U.S. solar plants. By 2025 generation it ranks 4,622nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Roadrunner Solar and BESS plant run compared with other solar plants?
The Roadrunner Solar and BESS plant had a capacity factor of 2% in 2025 on 235 MW of net summer capacity, the 2nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 6 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Roadrunner Solar and BESS | 2% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Roadrunner Solar and BESS plant generating more or less than last year?
Roadrunner Solar and BESS generated 32,947 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 32,947 |
| 2026 through August | 418,448 |
Monthly generation, Dec 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 58,020 |
| July 2026 | 60,076 |
| June 2026 | 69,464 |
| May 2026 | 72,600 |
| April 2026 | 58,299 |
| March 2026 | 31,565 |
| February 2026 | 36,144 |
| January 2026 | 32,280 |
| December 2025 | 32,947 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Roadrunner Solar and BESS plant, and when do they retire?
1 operable generator totals 235 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 235 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 235 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| RRPV | Operating | Solar Photovoltaic | 235 | 2025 | n/a |
| RRBES | Under construction, over half built | Batteries | 235 | 2026 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Roadrunner Solar and BESS plant?
EIA lists no joint owners for Roadrunner Solar and BESS. Clenera LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Roadrunner Solar and BESS plant?
Roadrunner Solar and BESS is in Cochise, Cochise County, Arizona, at 32.0861° N, 109.9353° W. It sits in the Western Area Power Administration - Desert Southwest Region balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Arizona are similar in size?
Arizona has 111 operable solar plants with 6,672 MW of capacity, and Roadrunner Solar and BESS' 235 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Harquahala 2 | Maricopa | 300 | 687,037 |
| Box Canyon (AZ) | Pinal | 300 | 506,892 |
| Solana Generating Station | Maricopa | 280 | 845,906 |
| Roadrunner Solar and BESS | Cochise | 235 | 32,947 |
| Sun Streams 3 | Maricopa | 215 | 532,548 |
| McFarland A Solar and Storage | Yuma | 200 | 550,669 |
| Brittlebush Solar | Pinal | 200 | 562,100 |
Source: EIA Forms EIA-860 and EIA-923, 2025.