Nuclear power plant, Washington
Columbia Generating Station, Washington
Columbia Generating Station is a 1,200 MW nuclear power plant in Benton County, Washington, operated by Energy Northwest-Columbia, and it generated 7,748,114 MWh in 2025 (Forms EIA-860 and EIA-923). That is 7.6% of the generation reported in Washington, and its capacity factor sits at the 4th percentile of U.S. nuclear plants. By 2025 generation it ranks 106th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Columbia Generating Station run compared with other nuclear plants?
Columbia Generating Station had a capacity factor of 77% in 2025 on 1,151 MW of net summer capacity, the 4th percentile of the 54 U.S. nuclear plants with at least 20 MW. The typical nuclear plant reached 95%. That equals about 280 days at full output out of 365.
0%Shaded: the middle half of nuclear plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Columbia Generating Station | 77% |
| Nuclear plants, 75th percentile | 97% |
| Nuclear plants, median | 95% |
| Nuclear plants, 25th percentile | 90% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Columbia Generating Station generating more or less than last year?
Generation at Columbia Generating Station fell 22.3% from 2024 to 2025, from 9,967,139 MWh to 7,748,114 MWh. Through August 2026 it is running 46.5% ahead of the same months of 2025.
1 month shows net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 9,967,139 |
| 2025 | 7,748,114 |
| 2026 through August | 6,437,546 |
| 2025, same months | 4,393,684 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 841,918 |
| July 2026 | 841,235 |
| June 2026 | 814,132 |
| May 2026 | 807,828 |
| April 2026 | 823,309 |
| March 2026 | 839,779 |
| February 2026 | 607,293 |
| January 2026 | 862,052 |
| December 2025 | 842,776 |
| November 2025 | 833,370 |
| October 2025 | 858,737 |
| September 2025 | 819,547 |
| August 2025 | 840,477 |
| July 2025 | 838,731 |
| June 2025 | 103,162 |
| May 2025 | -3,317 |
| April 2025 | 232,919 |
| March 2025 | 765,215 |
| February 2025 | 764,755 |
| January 2025 | 851,742 |
| December 2024 | 840,391 |
| November 2024 | 821,616 |
| October 2024 | 853,088 |
| September 2024 | 797,036 |
| August 2024 | 841,568 |
| July 2024 | 833,135 |
| June 2024 | 805,756 |
| May 2024 | 846,368 |
| April 2024 | 825,823 |
| March 2024 | 841,434 |
| February 2024 | 802,499 |
| January 2024 | 858,425 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Columbia Generating Station, and when do they retire?
1 operable generator totals 1,200 MW, with an average age of 41 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 1 | 1,200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 2 | Operating | Nuclear | 1,200 | 1984 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Columbia Generating Station?
EIA lists no joint owners for Columbia Generating Station. Energy Northwest-Columbia operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is Columbia Generating Station?
Columbia Generating Station is in Richland, Benton County, Washington, at 46.4711° N, 119.3339° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which Washington power plants are similar in size?
Columbia Generating Station is the only operable nuclear plant in Washington, so these are the plants of any fuel closest to its 1,200 MW.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Rocky Reach | Hydro | Chelan | 1,349 | 5,241,117 |
| Wanapum | Hydro | Grant | 1,220 | 4,437,537 |
| Columbia Generating Station | Nuclear | Benton | 1,200 | 7,748,114 |
| Boundary | Hydro | Pend Oreille | 1,160 | 3,099,497 |
| Priest Rapids | Hydro | Grant | 950 | 4,164,860 |
| Wells | Hydro | Chelan | 867 | 3,707,938 |
Source: EIA Forms EIA-860 and EIA-923, 2025.