Columbia Generating Station, Washington

Columbia Generating Station is a 1,200 MW nuclear power plant in Benton County, Washington, operated by Energy Northwest-Columbia, and it generated 7,748,114 MWh in 2025 (Forms EIA-860 and EIA-923). That is 7.6% of the generation reported in Washington, and its capacity factor sits at the 4th percentile of U.S. nuclear plants. By 2025 generation it ranks 106th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,200 MWNameplate capacity
77%Capacity factor, 2025, 4th percentile, on 1,151 MW net summer
7.6%Of WA generation, 2025
41 yearsAverage generator age, by MW

How hard does Columbia Generating Station run compared with other nuclear plants?

Columbia Generating Station had a capacity factor of 77% in 2025 on 1,151 MW of net summer capacity, the 4th percentile of the 54 U.S. nuclear plants with at least 20 MW. The typical nuclear plant reached 95%. That equals about 280 days at full output out of 365.

0%Shaded: the middle half of nuclear plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Columbia Generating Station77%
Nuclear plants, 75th percentile97%
Nuclear plants, median95%
Nuclear plants, 25th percentile90%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Columbia Generating Station generating more or less than last year?

Generation at Columbia Generating Station fell 22.3% from 2024 to 2025, from 9,967,139 MWh to 7,748,114 MWh. Through August 2026 it is running 46.5% ahead of the same months of 2025.

1 month shows net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
20249,967,139
20257,748,114
2026 through August6,437,546
2025, same months4,393,684
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026841,918
July 2026841,235
June 2026814,132
May 2026807,828
April 2026823,309
March 2026839,779
February 2026607,293
January 2026862,052
December 2025842,776
November 2025833,370
October 2025858,737
September 2025819,547
August 2025840,477
July 2025838,731
June 2025103,162
May 2025-3,317
April 2025232,919
March 2025765,215
February 2025764,755
January 2025851,742
December 2024840,391
November 2024821,616
October 2024853,088
September 2024797,036
August 2024841,568
July 2024833,135
June 2024805,756
May 2024846,368
April 2024825,823
March 2024841,434
February 2024802,499
January 2024858,425

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from Columbia Generating Station?

Columbia Generating Station made 7.6% of the 101,512,862 MWh reported by Washington plants in 2025, from 3.8% of the state's 31,712 MW of capacity. Its share of output is 2.0 times its share of capacity. By capacity it is the 5th largest of 139 plants in Washington, the 222nd largest of 14,327 in the U.S. and the 42nd largest of 56 nuclear plants. By 2025 generation it is the 3rd largest of 129 generating plants in the state.

Columbia Generating Station within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)1,20031,7123.8%
Generation (MWh)7,748,114101,512,8627.6%
Nuclear capacity (MW)1,2001,200100.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Columbia Generating Station, and when do they retire?

1 operable generator totals 1,200 MW, with an average age of 41 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s11,200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
2OperatingNuclear1,2001984n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Columbia Generating Station?

EIA lists no joint owners for Columbia Generating Station. Energy Northwest-Columbia operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is Columbia Generating Station?

Columbia Generating Station is in Richland, Benton County, Washington, at 46.4711° N, 119.3339° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which Washington power plants are similar in size?

Columbia Generating Station is the only operable nuclear plant in Washington, so these are the plants of any fuel closest to its 1,200 MW.

Power plants in Washington around this size
PlantFuelCountyMW2025 MWh
Rocky ReachHydroChelan1,3495,241,117
WanapumHydroGrant1,2204,437,537
Columbia Generating StationNuclearBenton1,2007,748,114
BoundaryHydroPend Oreille1,1603,099,497
Priest RapidsHydroGrant9504,164,860
WellsHydroChelan8673,707,938