Wind power plant, Mississippi

Delta Wind Farm, Mississippi

Delta Wind Farm (MS) is a 185 MW wind power plant in Coahoma County, Mississippi, operated by AES Clean Energy, and it generated 500,177 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Mississippi, and its capacity factor sits at the 44th percentile of U.S. wind plants. By 2025 generation it ranks 1,338th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

185 MWNameplate capacity
31%Capacity factor, 2025, 44th percentile, on 185 MW net summer
0.6%Of MS generation, 2025
1 yearAverage generator age, by MW

How hard does the Delta Wind Farm (MS) plant run compared with other wind plants?

The Delta Wind Farm (MS) plant had a capacity factor of 31% in 2025 on 185 MW of net summer capacity, the 44th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 113 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Delta Wind Farm (MS)31%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Delta Wind Farm (MS) plant generating more or less than last year?

Delta Wind Farm (MS) generated 500,177 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 11.8% ahead of the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024346,724
2025500,177
2026 through August371,940
2025, same months332,630
Monthly generation, Apr 2024 to Aug 2026
MonthMWh
August 202624,587
July 202621,242
June 202638,717
May 202637,046
April 202660,896
March 202674,948
February 202657,521
January 202656,983
December 202558,452
November 202547,802
October 202540,687
September 202520,606
August 202516,447
July 202516,851
June 202525,487
May 202537,955
April 202557,112
March 202576,337
February 202553,335
January 202549,106
December 202457,355
November 202449,906
October 202438,240
September 202431,367
August 202424,740
July 202418,534
June 202422,602
May 202438,587
April 202465,393

Source: EIA Form EIA-923, through August 2026.

How much of Mississippi's electricity comes from the Delta Wind Farm (MS) plant?

Delta Wind Farm (MS) made 0.6% of the 77,727,245 MWh reported by Mississippi plants in 2025, from 1.0% of the state's 17,862 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 22nd largest of 63 plants in Mississippi, the 1,722nd largest of 14,327 in the U.S. and the 356th largest of 1,358 wind plants. By 2025 generation it is the 20th largest of 57 generating plants in the state.

Delta Wind Farm (MS) within Mississippi, 2025
MeasureThis plantMississippiShare
Capacity (MW)18517,8621.0%
Generation (MWh)500,17777,727,2450.6%
Wind capacity (MW)185185100.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Delta Wind Farm (MS) plant, and when do they retire?

1 operable generator totals 185 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1185100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
DLTAOperatingOnshore Wind Turbine1852024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Delta Wind Farm (MS) plant?

EIA lists no joint owners for Delta Wind Farm (MS). AES Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Delta Wind Farm (MS) plant?

Delta Wind Farm (MS) is in Dundee, Coahoma County, Mississippi, at 34.4692° N, 90.3927° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which Mississippi power plants are similar in size?

Delta Wind Farm (MS) is the only operable wind plant in Mississippi, so these are the plants of any fuel closest to its 185 MW.

Power plants in Mississippi around this size
PlantFuelCountyMW2025 MWh
Silver CreekNatural gasJefferson Davis251282,338
Golden TriangleSolarLowndes250411,833
Golden Triangle IISolarLowndes200319,334
Delta Wind Farm (MS)WindCoahoma185500,177
Pearl River Solar Park LLCSolarScott175418,916
Chevron OilNatural gasJackson1711,111,834
SylvarenaNatural gasSmith141262,135

Source: EIA Forms EIA-860 and EIA-923, 2025.