Douglas is a 26.1 MW petroleum power plant in Cochise County, Arizona, operated by Arizona Public Service Co, and it generated 218 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 11th percentile of U.S. petroleum plants. By 2025 generation it ranks 12,415th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

26.1 MWNameplate capacity
under 1%Capacity factor, 2025, 11th percentile, on 15 MW net summer
12,415thU.S. rank by generation, 2025
53 yearsAverage generator age, by MW

How hard does the Douglas plant run compared with other petroleum plants?

The Douglas plant had a capacity factor of under 1% in 2025 on 15 MW of net summer capacity, the 11th percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of petroleum plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Douglasunder 1%
Petroleum plants, 75th percentile1%
Petroleum plants, median1%
Petroleum plants, 25th percentile0%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Douglas plant generating more or less than last year?

Generation at Douglas rose 134.4% from 2024 to 2025, from 93 MWh to 218 MWh.

Net generation by period
PeriodMWh
202493
2025218
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202517
November 202512
October 202520
September 202518
August 202516
July 202515
June 202528
May 202519
April 202521
March 202518
February 202516
January 202520
December 20247
November 20247
October 202410
September 20249
August 20246
July 202410
June 202410
May 20247
April 20248
March 20245
February 20245
January 20249

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Douglas plant?

Douglas made 0.0% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.1% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 115th largest of 191 plants in Arizona, the 4,514th largest of 14,327 in the U.S. and the 144th largest of 861 petroleum plants. By 2025 generation it is the 166th largest of 167 generating plants in the state.

Douglas within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)2640,5140.1%
Generation (MWh)218115,800,3780.0%
Petroleum capacity (MW)2626100.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Douglas plant, and when do they retire?

1 operable generator totals 26.1 MW, with an average age of 53 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s126100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingPetroleum Liquids261972n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Douglas plant?

EIA lists no joint owners for Douglas. Arizona Public Service Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Arizona Public Service Co charge homes?

Arizona Public Service Co, the operator of Douglas, had an average residential price of 17.03¢ per kWh and an average bill of $165 a month in 2025, 12% above the Arizona average of 15.26¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Arizona
Arizona Public Service Co17.03¢$16512% higher
Arizona average15.26¢$157
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Douglas plant?

Douglas is in Douglas, Cochise County, Arizona, at 31.3641° N, 109.5538° W. It sits in the Arizona Public Service Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which Arizona power plants are similar in size?

Douglas is the only operable petroleum plant in Arizona, so these are the plants of any fuel closest to its 26.1 MW.

Power plants in Arizona around this size
PlantFuelCountyMW2025 MWh
Avalon SolarSolarPima2964,176
Hyder II HybridSolarYuma2825,299
Novo BioPower PlantBiomassNavajo27202,323
DouglasPetroleumCochise26218
Mohave Electric Cooperative at Joy LaneBattery and pumped storageMohave2617,127
Avra Valley SolarSolarPima2561,488
Poseidon Solar, LLCSolarGILA2048,761