Wind power plant, Nevada

Spring Valley Wind Project, Nevada

Spring Valley Wind Project is a 150 MW wind power plant in White Pine County, Nevada, operated by Pattern Operators LP, and it generated 350,636 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.8% of the generation reported in Nevada, and its capacity factor sits at the 28th percentile of U.S. wind plants. By 2025 generation it ranks 1,770th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

150 MWNameplate capacity
27%Capacity factor, 2025, 28th percentile, on 150 MW net summer
0.8%Of NV generation, 2025
13 yearsAverage generator age, by MW

How hard does the Spring Valley Wind Project plant run compared with other wind plants?

The Spring Valley Wind Project plant had a capacity factor of 27% in 2025 on 150 MW of net summer capacity, the 28th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 97 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Spring Valley Wind Project27%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Spring Valley Wind Project plant generating more or less than last year?

Generation at Spring Valley Wind Project rose 9.8% from 2024 to 2025, from 319,340 MWh to 350,636 MWh. Through August 2026 it is running 20.3% behind the same months of 2025.

Net generation by period
PeriodMWh
2024319,340
2025350,636
2026 through August197,328
2025, same months247,722
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202618,012
July 202620,144
June 202630,823
May 202626,006
April 202629,807
March 202622,219
February 202626,669
January 202623,648
December 202531,126
November 202522,237
October 202530,714
September 202518,837
August 202524,456
July 202532,496
June 202526,602
May 202524,790
April 202528,840
March 202537,010
February 202534,487
January 202539,041
December 202424,396
November 202432,260
October 202425,460
September 202419,798
August 202431,639
July 202414,268
June 202423,967
May 202427,858
April 202427,248
March 202438,894
February 202430,075
January 202423,477

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Spring Valley Wind Project plant?

Spring Valley Wind Project made 0.8% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.8% of the state's 18,959 MW of capacity. By capacity it is the 33rd largest of 117 plants in Nevada, the 1,967th largest of 14,327 in the U.S. and the 452nd largest of 1,358 wind plants. By 2025 generation it is the 32nd largest of 112 generating plants in the state.

Spring Valley Wind Project within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)15018,9590.8%
Generation (MWh)350,63645,180,0660.8%
Wind capacity (MW)150150100.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Spring Valley Wind Project plant, and when do they retire?

1 operable generator totals 150 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WTGOperatingOnshore Wind Turbine1502012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Spring Valley Wind Project plant?

Spring Valley Wind LLC is the only joint owner reported for Spring Valley Wind Project, with 100.0%. Pattern Operators LP operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Spring Valley Wind Project plant?

Spring Valley Wind Project is in Ely, White Pine County, Nevada, at 39.1042° N, 114.4922° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which Nevada power plants are similar in size?

Spring Valley Wind Project is the only operable wind plant in Nevada, so these are the plants of any fuel closest to its 150 MW.

Power plants in Nevada around this size
PlantFuelCountyMW2025 MWh
Silver State South StorageBattery and pumped storageClark200-36,730
Yellow Pine SolarSolarClark190376,251
Copper Mountain Solar 2SolarClark154726,034
Spring Valley Wind ProjectWindWhite Pine150350,636
Saguaro PowerNatural gasClark127264,486
Battle Mountain Solar ProjectSolarHumboldt126271,917
Crescent Dunes Solar EnergySolarNye12558,997

Source: EIA Forms EIA-860 and EIA-923, 2025.