Coal power plant, Washington

Transalta Centralia Generation coal power plant, Washington

Transalta Centralia Generation is a 730 MW coal power plant in Lewis County, Washington, operated by TransAlta Centralia Gen LLC, and it generated 3,150,473 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.1% of the generation reported in Washington, and its capacity factor sits at the 54th percentile of U.S. coal plants. By 2025 generation it ranks 375th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

730 MWNameplate capacity
54%Capacity factor, 2025, 54th percentile, on 670 MW net summer
3.1%Of WA generation, 2025
52 yearsAverage generator age, by MW

How hard does the Transalta Centralia Generation plant run compared with other coal plants?

The Transalta Centralia Generation plant had a capacity factor of 54% in 2025 on 670 MW of net summer capacity, the 54th percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 195 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Transalta Centralia Generation54%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Transalta Centralia Generation plant generating more or less than last year?

Transalta Centralia Generation generated 3,150,473 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 100.0% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.

Net generation by period
PeriodMWh
20242,831,744
20253,150,473
2026 through August0
2025, same months1,926,666
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20260
July 20260
June 20260
May 20260
April 20260
March 20260
February 20260
January 20260
December 202584,115
November 2025378,730
October 2025420,045
September 2025340,917
August 2025284,998
July 2025360,055
June 2025241,902
May 20250
April 20250
March 2025268,920
February 2025340,594
January 2025430,197
December 2024307,942
November 2024350,283
October 2024382,309
September 2024273,309
August 2024353,129
July 2024351,501
June 20241,721
May 20240
April 20240
March 2024201,080
February 2024306,733
January 2024303,737

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Transalta Centralia Generation plant?

Transalta Centralia Generation made 3.1% of the 101,512,862 MWh reported by Washington plants in 2025, from 2.3% of the state's 31,712 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 12th largest of 139 plants in Washington, the 460th largest of 14,327 in the U.S. and the 93rd largest of 195 coal plants. By 2025 generation it is the 9th largest of 129 generating plants in the state.

Transalta Centralia Generation within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)73031,7122.3%
Generation (MWh)3,150,473101,512,8623.1%
Coal capacity (MW)730730100.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Transalta Centralia Generation plant, and when do they retire?

1 operable generator totals 730 MW, with an average age of 52 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 6 have already retired, totalling 1,052 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s1730100%none reported
Every generator, 7 in all
UnitStatusTechnologyMWIn servicePlanned retirement
2OperatingConventional Steam Coal7301973n/a
1RetiredConventional Steam Coal73019722020
30RetiredNatural Gas Fired Combined Cycle6120022013
40RetiredNatural Gas Fired Combined Cycle6120022013
50RetiredNatural Gas Fired Combined Cycle6120022013
60RetiredNatural Gas Fired Combined Cycle6120022013
70RetiredNatural Gas Fired Combined Cycle8020022013

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Transalta Centralia Generation plant?

EIA lists no joint owners for Transalta Centralia Generation. TransAlta Centralia Gen LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Transalta Centralia Generation plant?

Transalta Centralia Generation is in Centralia, Lewis County, Washington, at 46.7559° N, 122.8598° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which Washington power plants are similar in size?

Transalta Centralia Generation is the only operable coal plant in Washington, so these are the plants of any fuel closest to its 730 MW.

Power plants in Washington around this size
PlantFuelCountyMW2025 MWh
Little GooseHydroColumbia8101,589,274
Lower MonumentalHydroWalla Walla8101,476,976
Lower GraniteHydroWhitman8101,461,002
Transalta Centralia GenerationCoalLewis7303,150,473
Grays Harbor Energy FacilityNatural gasGrays Harbor7153,649,445
Rock IslandHydroChelan6292,226,611
Ice HarborHydroWalla Walla6031,511,186

Source: EIA Forms EIA-860 and EIA-923, 2025.